← Back to Learning Paths
MVP Launch Track
Ship a minimum viable product quickly and safely without over-engineering
145
Minutes
6
Milestones
15
Total Steps
11
Required
Track Objectives
- Validate product-market fit before over-investing
- Ship working code to production quickly
- Implement essential security and monitoring
- Avoid premature optimization and complex architectures
1
Validate the Problem
Ensure you're building something people need
2
Plan Simply
Design for MVP scale, not future complexity
Step 1
Required
surface
Threat Modeling
Identify the 3 most critical security risks to address now
� Checkpoint: Have you identified at least 3 potential threats and mitigation strategies?
15 min
Step 2
Required
surface
Architecture Design
Choose the simplest architecture that could work for your MVP
15 min
Step 3
Domain Specific/web Apps/architecture Decisions/microfrontend Vs Monolith
Learn when NOT to use complex architectures - avoid over-engineering
� Checkpoint: Do you understand the quantitative thresholds for architecture decisions?
5 min
Step 4 surface
Data Flow Mapping
Understand where data flows to spot security and compliance issues
10 min
3
Build Securely
Write code that works and is safe enough
4
Test What Matters
Test critical paths, skip perfection
5
Ship Safely
Deploy with ability to rollback and monitor
6
Know When It Breaks
Basic monitoring to catch critical failures
What's Next
- � After shipping MVP and validating product-market fit, consider production-ready track
- � If handling sensitive data or need compliance, review security-hardening track
- � Once you have real users and usage data, revisit architecture decisions with actual metrics